TheraRadar

Renal Phase 3 Readout Calendar

Industry-sponsored renal trials with primary completion in the next 12 months or last 12 months.

Data last updated September 20, 2026 · source: ClinicalTrials.gov

Pro feature
10
Next 6 months
13
Next 12 months
1
Results posted
34
Phase 3 Renal

What you can answer with this page

A confidence-graded calendar of every industry Phase 3 renal trial reading out in the next 12 months — with a per-row staleness flag so you know which completion dates are still credible.

What renal trials are reading out soon?
The "upcoming" section shows industry-sponsored Phase 3 renal trials with primary completion ahead, soonest first, each graded by how credible that date is.
Which renal trials have already read out?
The "recently read out" section shows Phase 3 renal trials whose primary endpoint completed in the last 12 months — results posted, or completed and awaiting topline.
How are these readout dates sourced?
Every date is the ClinicalTrials.gov primary completion date — the only public, structured signal. We grade each by whether it is actual or sponsor-estimated, and by how recently the trial record was updated.
Where can I see readouts for other therapeutic areas?
The full cross-area calendar is on the main readout calendar; this page is the Renal slice of it.

Recently read-out results are free; the upcoming calendar shows a free preview. See the full cross-area calendar → or the Renal landscape →

Recently read out & awaiting topline — Renal

· 2

Phase 3 renal trials whose primary endpoint completed in the last 12 months — results posted, or completed and awaiting topline. Most recent first.

Sponsor Trial / Asset Indication Status Primary completion Confidence NCT
Eli Lilly and Company
A Study of Daily Oral Orforglipron (LY3502970) Compared With Insulin Glargine in Participants With Type 2 Diabetes and Obesity or Overweight at Increased Cardiovascular Risk
Asset: Orforglipron
Type 2 Diabetes +5
Completed
Q1 2026
2026-03-16
Completed · awaiting
Updated 5mo ago
NCT05803421
Bayer
A Trial to Learn How Well Finerenone Works and How Safe it is in Adult Participants With Non-diabetic Chronic Kidney Disease
Non-diabetic Chronic Kidney Disease
Completed
Q4 2025
2025-12-31
Completed · awaiting
Updated 7mo ago
NCT05047263

Upcoming renal readouts — next 12 months

· 13

Industry Phase 3 renal trials with primary completion ahead, soonest first — confidence-graded by date type and CT.gov staleness.

Sponsor Trial / Asset Indication Status Primary completion Confidence NCT
Kind Pharmaceuticals LLC
A Study of AND017 to Evaluate Efficacy and Safety in Dialysis-Dependent Chronic Kidney Disease (DD-CKD) Patients With Anemia
Asset: AND017 capsules
Anemia Due to Chronic Kidney Disease
Recruiting
Q4 2026
2026-10-30 (est.)
Estimated · fresh
Updated 6mo ago
NCT07494409
Ebima Clifford Okundaye
Use of New Drug QRX-3 for Prevention and Treatment of Chronic Kidney Disease Progression
Asset: QRX-3
Chronic Kidney Diseases +2
Not Yet Recruiting
Q4 2026
2026-10 (est.)
Estimated · aging
Updated 12mo ago
NCT06866236
Humacyte, Inc.
To Compare the Efficacy and Safety of the ATEV With AVF in Female Patients With End-Stage Renal Disease Requiring Hemodialysis
Asset: Acellular Tissue Engineered Vessel (ATEV)
End Stage Renal Disease (ESRD)
Active Not Recruiting
Q4 2026
2026-10 (est.)
Estimated · stale
Updated 18mo ago
NCT05908084
Shaanxi Micot Pharmaceutical Techn…
Study of MT1013 for the Treatment of Patients With Secondary Hyperparathyroidism
Asset: MT1013
Secondary Hyperparathyroidism, Chronic Kidney Disease
Recruiting
Q4 2026
2026-11-26 (est.)
Estimated · aging
Updated 12mo ago
NCT07122401
Kind Pharmaceuticals LLC
A Study of AND017 to Evaluate Efficacy and Safety in Patients With Anemia Due to Non-Dialysis-Dependent Chronic Kidney Disease (NDD-CKD)
Asset: AND017
Anemia Due to Chronic Kidney Disease
Recruiting
Q4 2026
2026-12-01 (est.)
Estimated · fresh
Updated 6mo ago
NCT07487727
Unlock 8 more renal readouts · plus filters on the full calendar
Upgrade to Pro

About this calendar

Dates anchor on the ClinicalTrials.gov primary completion date — the only public, structured signal — and are graded by date type (actual vs sponsor-estimated) and how recently the record was updated. Sponsor-estimated dates can slip silently, so treat each as a current target rather than a guarantee. See the full readout calendar for all areas and filters.